A facelift for the 3 INPH institutes
The INP-HB project consisted in rehabilitating a significant part of the sealing system for buildings making up the 3 INPH institutes (ENSTP, INSET, ENSA) built during the 1980s. Work was carried out in two distinct phases, phase I which took 12 months and was completed in April 2017 and phase II which lasted 15 months and was completed in March 2019.
A total surface area of over 65,000m² was restored, with the additional constraint of having to complete work on a site that was in use.
65,000
m² of surface area
2
work phases
11,800
m² of metal covering