I v o r y C o a s t

THE PRIMA SHOPPING MALL

All projects
Company
SETAO
Project Owner
SCI HASA
Architects
BIIN (F. Jendron) / BAMBA
Legal framework
Private market
Handover
31/10/2015
Timeframe
10 mois
Significant figures
Surface area: 5,300 m²
City
Abidjan
Country
Ivory Coast

Floor-to-ceiling renovation

The property investment company HASA awarded SETAO with the PRIMA Center contract, comprising two buildings with a shopping mall and a CASINObrand supermarketThe revamping of the centre included shopping mall, building façades and exterior outfitting. 

The project involved changing shop windows, floors and ceilingscreating new toilet facilities and a green wall in the atrium. Work also took in renovating the electrical installation and the air-conditioning systemThe project also included replacing air-handling systems and updating smoke extraction units to bring them into line with compliancy 

Renovation carried out on the shopping mall façades included modifying entrances by installing metal frameworksplacing slatted, wood-colour, high-density, compact laminated panel claddingcreating 5 stalls and levelling the wall on the cinema side. 

Where exterior outfitting was concerned, SETAO also redesigned paths and thoroughfares between buildings, sidewalks, green spaces and children’s play areas 

5,300 m² of surface area
2 buildings
1 supermarket
01
rotate

Please rotate your device to landscape mode for a better experience